top of page

POH JIA JOU
PROJECT 1: ANALYZING BUILDING DESIGN STRATEGIES
In a group, we were to choose a building that best features 2 passive design strategy for tropical climate. The group will select one building in Klang Valley that is a certified and recognized as Green Building, referred to the building listed in the green building index. The building we chose was Menara PJH in Putrajaya.
After this project, I am able to identify the environmental conditions that are related to site conditions. Besides that, I learnt how shading devices help to achieve thermal comfort in a building.
Teammates:
Tan Wei Sen
Tan Chin Werng
Wong Lieng Kam
Wong Lok Xuan
Chew Rui Bo
Lim Men Horng
Poh Jia Jou
bottom of page