top of page

POH JIA JOU
PROJECT 1- TIMELINE & DIAGRAM ANALYSIS
This research project adopts document analysis methodology that involves documenting, analyzing, producing, and a critical chronological and diagrammatical interpretation of Modern Malaysian architectural history. This project emphasizes critical analysis of the post Merdeka/Independance of Malaysian architecture in the effort to understand the influences of post-modernism to architectural design and construction, building science and technology, and urban design.
In a group of 12, we were required to produce a diagrammatic analysis illustratively and in text, a critical chronology analysis interpretation of Modern Malaysian architecture. We were then divided into smaller groups of 4 to analyse 5 buildings in South West Kuala Lumpur each before compiling all 15 buildings into a timeline.
Teammates:
Olivia Jong
Paul Wong
Phan Guang Lei
Poh Jia Jou
![]() | ![]() |
---|---|
![]() | ![]() |
![]() |
PROJECT 2 - REPORT
Grouping with the same teammates as project 1, 4 of us conducted a research and architectural analysis on a selected building which was the Maybank Tower. Other than doing researches on the internet, we went to the Maybank Tower to experience it ourselves. This helped us to know more about the beauty of Maybank Tower architectural style.
bottom of page